Drilling, Grouting and Anchoring Jumbo, Please Keep These Maintenance Points in Mind!
DWS901 Drilling, Grouting and Anchoring Jumbo is a tunnel engineering equipment developed, produced and assembled by ZSIM.
DWS901 jumbo is widely used in various engineering scenarios such as mining, tunnel excavation, slope anchoring, etc. In mining, it can achieve complete drilling, grouting and anchoring to speed up the mining construction. In tunnel excavation, it can reinforce the surrounding rock of the tunnel to ensure safety. In slope stabilization, it can enhance the stability of the slope and prevent collapse.
However, the maintenance of the drilling jumbo is extremely critical. Non-professionals are prohibited from disassembling and repairing without authorization, otherwise the supplier has the right to refuse the maintenance or repair.
· Daily check the hydraulic system. Once the color of the hydraulic oil is abnormal, please replaced it immediately.
· Different seasons require the hydraulic oil with different viscosity.
· Regularly clean the oil tank and oil filter.
· Diesel engine power system running-in.
· Change the engine oil and filter according to regulations.
· Maintain chassis, propeller, lubrication system, and other devices regularly.
Strictly follow the above maintenance specifications can the drilling jumbo reduce failures, extend its service life, and play a stable role in various complex engineering scenarios.
Furthermore, if you encounter difficulties during maintenance, or your drilling jumbo breaks down, we can provide comprehensive after-sales support online or offline. If the problem is more complicated and if you want to solve it on site, we also can provide on-site repair and maintenance services. Our response is quick.
Let us work together to do a good job on maintenance, and let us our drilling jumbo to serve your project efficiently!