The Shipping of DW902 Makes ZSIM Sales Soar
All great achievements are the result of continuous struggle; all great undertakings need to be promoted in the future. ZSIM adopts sophisticated equipment and superb technology to develop high-quality products, and has won the trust and praise of countless customers.
On October 9, 2023, ZSIM delivered the well-equipped and high-quality DW902 multi-functional anchor drill rig to the job site to help the construction of the Xiyu High-speed Railway. Counting the 18-year history, ZSIM has provided multiple safe and efficient equipment in the construction of high-speed railways.
DW902 anchor drill rig is used in tunneling and excavation in hydropower, railway, highway and other fields. The operating mechanism adopts full hydraulic drive; the anchoring power head and coring power head can be replaced to achieve excavation advance detection hole, horizontal coring operation, pipe shed grouting, slope anchor cable installation, etc. The machine equipped with an engine to supply walking power with climbing ability ≤18%. The walking speed can reach 14km/h. The machine has the characteristics of high lifting height, compact structure, low center of gravity, flexible maneuverability, stable operation, etc. It can not only improve safety, but also reduce the work intensity of the operator, so as to improve work efficiency. | |
DW902 has the following functions, 1. Wireless remote control Safe area control 2. Data recording Data storage and analysis 3. Remote monitoring PC side 4. Grouting system Real-time parameter monitoring 5. Line integrationHierarchical electric control box 6. Harmful gas alarm 7. Excavation data recording 8. Driving data monitoring 9. Split-screen operation of the steering machine on the operating table 10. Arch anchors can be drilled in three-step excavation tunnels 11. Direct control of rock drilling system, equipped with the functions of automatic anti-stuck drill rod and automatic return function at the end point. Impact, rotation, and propulsion have their own hydraulic pumps. Low-pressure and high-flow hydraulic system takes into account efficient rock drilling, which prevents drill rod locking, improves drill rod consumption, and reduces operating costs. 12. Equipped with a work service platform, it is convenient and fast to carry out various high-level operations in tunnels. | |
【Operation capability】 Blast holes and anchor holes drilling, advance small guide tubes, charging, anchor rods installation, etc. 【Working condition】 The highest operating altitude is 4000m. The operating environment temperature is -20~ 45°C. It can work normally in dusty and humid tunnels, underground and other environments. 【Tunnel engineering】 Tunnel excavation blasting holes. Tunnel engineering drainage and gas drainage. |
When external pressure increases, the internal motivation should be strengthened. In the face of existing achievements, ZSIM will continue to ride on the ideal horse, whip up the whip and set off. The spring scenery is just right on the road, the sun is shining in the sky, and we will always have mountains and valleys in our hearts and shake the mountains and rivers immediately!